Well, although this blog has been silent lately, we have been diligently working. Ever since I got back from France I’ve been trying to get the plans approved by the city. And finally, last Thursday, they were! So after paying them a healthy, rather large, and rather unexpected large fee, we have our plans in hand and are ready to start building. But, uh, actually it’s not that simple. See, we want to put radiant floors in. And that means we need to have these special WarmBoard panels that act as both the subfloor and the holder for the tubes that keep the floor warm. They need to be ordered in special configurations that meet the layout of the house. In order to do that you have to figure out how many zones and loops you’re going to have and generally how your radiant system is going to work. The lumber had to be ordered as well. And we never poured the concrete piers for the inside of our foundation. And since we’re doing a truss roof, that needed to be configured and ordered as well. The rough plumbing, which includes the sewer lines, the waste line, and all the hot and cold water that will run under the floor all needed to be figured out and ordered. The One-and-Only-Greatly-Revered-and-Lauded George Williams was very generous with his time and drew these amazing schematics that showed how every part of our rough plumbing system would work. He then wrote up a manifest with every part we needed and got it priced for us (at a discout I might add). How awesome is that??? We owe George, big time. 

At this point, all of our construction materials are ordered and scheduled and will be delivered in a timely fashion. It’s like we’ve been laboriously pushing a big boulder up to a mountaintop and are about to let it fly down the other side. It’s a strange time to start building since it seems as though all building has stopped and since the holidays are just about to kick in to high gear, but that’s how we do. 

Last week Reggie and I installed our salvaged doors (with a super-expensive jamb added after-the-fact) into the shack. It gives the shack a certain viable presence now. Makes it feel like a real building. Also I dug holes for the piers and built forms for pouring concrete into them. I’ll get them inspected tomorrow and hopefully we can pour concrete into them on Tuesday. That will kick off the floor building spree. After the floors get built I’ll install the plumbing. Then the WarmBoard goes on, including the PEX tubing. After that the walls get built and then finally the roof trusses are tacked on top. I’m hoping to have all this done by February. Heh. Wish us luck.